Cement Rail Loadout
Location
Cape Giradeau, MO
Project Facts
136 EA - 24-in dia. Driven Pipe Piles (closed end) driven to a length of 85ft below grade
31 EA - 18-in dia. Driven Pipe Piles (closed end) driven to a length of 85ft below grade
Pipe piles came in two sections which required us to field splice them
Project Scope
Furnish and drive pipe piles for future elevated silo, transfer tower, rail loading shead and conveyors to transport cement to the silot for the concrete facility.
Completed For
Confidential
Cement Rail Loadout
Location
Cape Giradeau, MO
Project Facts
136 EA - 24-in dia. Driven Pipe Piles (closed end) driven to a length of 85ft below grade
31 EA - 18-in dia. Driven Pipe Piles (closed end) driven to a length of 85ft below grade
Pipe piles came in two sections which required us to field splice them
Project Scope
Furnish and drive pipe piles for future elevated silo, transfer tower, rail loading shead and conveyors to transport cement to the silot for the concrete facility.