Irishtown Bend Stabilization Project

Location

Cleveland, OH

Project Facts

136,000 SF Anchored Combi-Wall Bulkhead
203 EA - Pipe Piles (PAZ-54 & PAZ-60) up to 69ft in length
202 EA - Sheet Piles (NZ-14)
203 EA - Tieback Anchors (12, 17 & 26-strand) up to 220ft in length
2,000 LFT of Walers
30,000 tons of stone backfill
107,000 CYDS of excavated material

Project Scope

Furnish and install combi-wall bulkhead for stabilization of a massive hillside slope failure to protect the shipping channel along the Cuyahoga River and create public space. Goettle acted as the Prime Contractor.

Completed For

Cleveland-Cuyahoga County Port Authority

Irishtown Bend Stabilization Project

Location

Cleveland, OH

Project Facts

136,000 SF Anchored Combi-Wall Bulkhead
203 EA - Pipe Piles (PAZ-54 & PAZ-60) up to 69ft in length
202 EA - Sheet Piles (NZ-14)
203 EA - Tieback Anchors (12, 17 & 26-strand) up to 220ft in length
2,000 LFT of Walers
30,000 tons of stone backfill
107,000 CYDS of excavated material

Project Scope

Furnish and install combi-wall bulkhead for stabilization of a massive hillside slope failure to protect the shipping channel along the Cuyahoga River and create public space. Goettle acted as the Prime Contractor.