Neyland Stadium South Renovation (NSSR)

Location

Knoxville, TN

Project Facts

7,300 SF of design-build permanent earth retention
1,500 LFT of Soldier Piles installed
2,500 LFT of Tieback Anchors installed
3 EA - performance load tests
Proof tests performed on all tieback anchors

Project Scope

Designed and installed a permanent earth retention system with waterproofing and shotcrete facing to allow for the excavation and construction of a concourse addtition. Over 200 LFT of pinnacle Dolomite rock removed (12,000-45,000psi).

Completed For

University of Tennessee

Neyland Stadium South Renovation (NSSR)

Location

Knoxville, TN

Project Facts

7,300 SF of design-build permanent earth retention
1,500 LFT of Soldier Piles installed
2,500 LFT of Tieback Anchors installed
3 EA - performance load tests
Proof tests performed on all tieback anchors

Project Scope

Designed and installed a permanent earth retention system with waterproofing and shotcrete facing to allow for the excavation and construction of a concourse addtition. Over 200 LFT of pinnacle Dolomite rock removed (12,000-45,000psi).