Duke Energy Office Building
Location
Bedford, IN
Project Facts
12, 7" diameter micropiles
Average length - 40'
3 located inside existing building
Entrance to existing building 3.5'
Project Scope
Limited headroom installation of 7" micropiles at 45' long
3 were installed with 12' headroom using a Klemm 701 drill
Completed For
Duke Energy
Duke Energy Office Building
Location
Bedford, IN
Project Facts
12, 7" diameter micropiles
Average length - 40'
3 located inside existing building
Entrance to existing building 3.5'
Project Scope
Limited headroom installation of 7" micropiles at 45' long
3 were installed with 12' headroom using a Klemm 701 drill