18,800 SF - Temporary earth retention with untreated wood lagging
83 EA - Drilled in soldier piles at 35’- 45’ in length
98 EA - 14” diameter auger ties at 40’ in length

Project Scope

Design-Build temporary earth retention system for the ozone treatment facilities to be installed at Collins Park Water Treatment Plant.