BP ECI Barrier Wall
Location
East Chicago, IN
Project Facts
352 EA - King Piles at 50ft in length
425 EA - Bulkhead pairs at 50ft in length
425 EA - Deadman pairs at 30ft in length
325 EA - Tierods at 90ft in length
173 EA - Walers
Project Scope
Installation of a 2,200 LFT king pile wall as a remedy for the South Tank Farm to act as an oil control barrier using a sealed barrier wall system (cut-off wall) to prevent any harmful contaminants from entering the canal. The barrier wall system was designed to provide structual support for futre canal dredging operations.
Completed For
Remediation Management Services Company
BP ECI Barrier Wall
Location
East Chicago, IN
Project Facts
352 EA - King Piles at 50ft in length
425 EA - Bulkhead pairs at 50ft in length
425 EA - Deadman pairs at 30ft in length
325 EA - Tierods at 90ft in length
173 EA - Walers
Project Scope
Installation of a 2,200 LFT king pile wall as a remedy for the South Tank Farm to act as an oil control barrier using a sealed barrier wall system (cut-off wall) to prevent any harmful contaminants from entering the canal. The barrier wall system was designed to provide structual support for futre canal dredging operations.