Riverside Drive Phase 1

Location

Cincinnati, OH

Project Facts

209 EA - Soldier Piles at 55’ length in 48” diameter holes
202 EA - 7 & 8 Strand anchors at 105’ length
40 horizontal drains at 175’ length
5’ thick by 4’ tall concrete cap
Total length of wall at 1,177’

Project Scope

Design-build permanent earth retention system for failing hillside.

Completed For

City of Cincinnati

Riverside Drive Phase 1

Location

Cincinnati, OH

Project Facts

209 EA - Soldier Piles at 55’ length in 48” diameter holes
202 EA - 7 & 8 Strand anchors at 105’ length
40 horizontal drains at 175’ length
5’ thick by 4’ tall concrete cap
Total length of wall at 1,177’

Project Scope

Design-build permanent earth retention system for failing hillside.