LPV 148.02 Chalmette Loop Levee
Location
New Orleans, LA
Project Facts
Installed 5,905 HP 14x 117 to a length of 152ft with up to a 2:1 batter
Total length of driven piles equal to 170 miles
Project required a total of 9 crews and 16 cranes to complete our scope of work.
Project Scope
Driven piles for the construction of 8 miles of T-wall for the New Orleans HDSRRS project
Project schedule 26 weeks
Completed For
USACE
LPV 148.02 Chalmette Loop Levee
Location
New Orleans, LA
Project Facts
Installed 5,905 HP 14x 117 to a length of 152ft with up to a 2:1 batter
Total length of driven piles equal to 170 miles
Project required a total of 9 crews and 16 cranes to complete our scope of work.
Project Scope
Driven piles for the construction of 8 miles of T-wall for the New Orleans HDSRRS project
Project schedule 26 weeks