BAF Secant Pile Project

Location

Binghamton, NY

Project Facts

131 EA - 1,500 mm x 36’ Secant Piles
11 EA - 1,500 mm x 45’ Secant Piles
17 Caissons - 30” diameter, 35’-40’ in length 235 tons of reinforcing steel

Project Scope

Installation of 17 caissons and 142 secant piles.
Project was performed with a BG40 and BG-39 drilling simultaneously on a 200’x100’ site.
Piles were installed through sand and clay overburdens with the casing and tooling advanced through 17,000 PSI share and limestone.

Completed For

Binghamton Sewage Treatment Palnt

BAF Secant Pile Project

Location

Binghamton, NY

Project Facts

131 EA - 1,500 mm x 36’ Secant Piles
11 EA - 1,500 mm x 45’ Secant Piles
17 Caissons - 30” diameter, 35’-40’ in length 235 tons of reinforcing steel

Project Scope

Installation of 17 caissons and 142 secant piles.
Project was performed with a BG40 and BG-39 drilling simultaneously on a 200’x100’ site.
Piles were installed through sand and clay overburdens with the casing and tooling advanced through 17,000 PSI share and limestone.