Consolidation grouting is a general term for grouting that is carried out within a rock mass with the intent of filling rock mass discontinuities. The process involves injecting a grout material to fill the discontinuities, which are the pathways through which fluids or gases migrate in most rocks. With grout filling the rock discontinuities, the hydraulic gradient is reduced as the liquids or gases move through the grout, ultimately reducing or stopping migration. The following grouting operations often employ consolidation grouting:
Pre-excavation Grouting
Grout Curtain
Foundation Grouting
Water Cut-Off Grouting
Successful implementation of a consolidation grouting program is contingent on development of an appropriate drilling program along with choosing a grout that is amenable to the rock mass discontinuities.
We have performed consolidation grouting on numerous projects in many varying geologies. Typical projects include pre-excavation grout curtains for shafts, foundation grouting/grout curtains for dams, pre-excavation grouting for shafts, drifts, and tunnels, and water cutoff grouting for underground operations. Key in our successful completion of these projects has been our ability to configure equipment for proper drilling access and our ability to apply all types of grout.
Corporate Headquarters
Cincinnati
12071 Hamilton Avenue
Cincinnati, Ohio 45231
513.825.8100
Regional Offices
Pittsburgh
2100 Corporate Dr Ste 250
Wexford, PA 15090
412.635.7155
Chicago
2700 International Dr Ste 302
West Chicago, IL 60185
630.206.4056
Knoxville
9111 Cross Park Dr Ste D200
Knoxville, TN 37923
513.675.8108
Charlotte
2626 Bennett Rd
Fort Mill, SC 29715
803.548.1480
Clearwater
12300 44th St. N.
Clearwater, FL 33762
727.572.9200
© 2024 Richard Goettle, Inc. All Rights Reserved. Website by BigSmall Agency.
Inquiries
For any questions, pricing, or more information, please call: 513.825.8100 or fill out the form.
Employment
To apply for a position with our company, please visit our Careers page.