Stuart & Killen Stations

Location

Aberdeen, OH

Project Facts

2 EA -40’ diameter River Cells
60 EA -20’ diameter River Cells
100 EA -Battered and Vertical H-Piles
11,000 LF of H-Piles
62,000 CY of Stone Fill
27,000 CY Dredged excavation

Project Scope

Design-build foundation for conveyer bents, vehicular, and walkwaybridges. 12 Month Project Duration.

Completed For

Dayton Power & Light

Stuart & Killen Stations

Location

Aberdeen, OH

Project Facts

2 EA -40’ diameter River Cells
60 EA -20’ diameter River Cells
100 EA -Battered and Vertical H-Piles
11,000 LF of H-Piles
62,000 CY of Stone Fill
27,000 CY Dredged excavation

Project Scope

Design-build foundation for conveyer bents, vehicular, and walkwaybridges. 12 Month Project Duration.