White River CCS Phase 2
Location
Indianapolis, IN
Project Facts
1 - 11'-0" dia. x 210 LF drop shafts
1 - 13'-6" dia. x 210 LF ventilation shafts
220 LF of overburden drilling - fully cased
220 LF of rock drilling
Project Scope
Installation of a drop shaft and ventilation shaft for a combined sewer overflow
Removal of overburden material using a crane mounted drill and slurry
Removal of rock using a reverse circulation drill
Completed For
Citizens Energy Group
White River CCS Phase 2
Location
Indianapolis, IN
Project Facts
1 - 11'-0" dia. x 210 LF drop shafts
1 - 13'-6" dia. x 210 LF ventilation shafts
220 LF of overburden drilling - fully cased
220 LF of rock drilling
Project Scope
Installation of a drop shaft and ventilation shaft for a combined sewer overflow
Removal of overburden material using a crane mounted drill and slurry
Removal of rock using a reverse circulation drill